For a Gantt chart, see appendix A.
The following describes the preferred completion dates and does not
exclude the possibility of a few phases overlapping. These are the
'ideal dates', but there is still time to accommodate changes if need
be.
- Readings on game theory and implementation of game playing programs
need to be fully completed by the end of week 11.
- Readings on advanced graphical models and coding them in GLUT must
be completed by beginning of semester 2, although more of that could
be complemented within the phase of maintenance and extension.
- Requirement Analysis - to be completed by the end of week 3.
- Specification - to be completed by the end of week 5.
- High-level Design - to be completed by the end of week 7.
- Low-level Design - to be completed by the end of week 11. This will
require a great deal of work, therefore, a month is allocated for
that stage.
- Implementation - to be completed by the beginning of semester 2. Please
note that these phase will have begun 2 months earlier (as indicated
in the Gantt chart).
- Testing - to be completed by the end of week 3 of semester 2.
- Simulation - collection and analysis of data to be completed by the
end of week 3 of semester 2. This should not really require more than
a few days to complete.
- Documentation - to be completed by the end of week 4 of semester 2.
- Maintenance and Extension - to be considered as time allows.
Note that the above plan leaves a few weeks vacant until the demonstration.
This is, in principal, a safety net that should be used mainly to
cover for work on stages 5-7, which are possibly the most crucial
ones. Shall any of these stages happen to progress more slowly than
anticipated, they should occupy these weeks at the expense of research
and extra work (c/f Section 4.2).